Brembo Mizar
330 people were involved to carry out this project perfectly.
GP Construcción ® carried out the second industrial building of Brembo Mizar, in the GP Escobedo Industrial Park, with about 226,040 sqft of construction.
We take care of the preliminary work: dirt, deep foundations, civil works, metal structure, pavements and pavements, finishes and exterior works.
The main challenge was to be a hybrid work, which means a mixture of industrial and metal work, which carries a large amount of concrete, concrete furnaces, very heavy concrete foundations, concrete slabs, 426 linear ft of concrete pits with a depth of 20 ft to support conveyor belts.