To improve connectivity and promote development, we are building the Santa Catarina Viaduct

Published
June 6, 2024
To improve connectivity and promote development, we are building the Santa Catarina Viaduct

We built the viaduct that crosses the Santa Catarina River for our client ROADIS; this project is an extension and modernization of the Saltillo-Monterrey highway up to Gustavo Díaz Ordaz Boulevard. 

The elevated infrastructure is designed to ease traffic congestion and save residents traveling to the Monterrey metropolitan area up to 20 minutes per trip; it has two lanes in each direction and a capacity of 3 million vehicles per year. Additionally, it plays a strategic role in connecting the region’s commercial activities with the U.S. border.

‍

The viaduct is designed to ease local traffic flow through various connections to the road network.
The viaduct is designed to ease local traffic flow through various connections to the road network.

‍

Great progress for the region

From the end of the Monterrey-Saltillo Highway in the Huastecas region to its junction with Gustavo Díaz Ordaz Avenue—which runs over Morones Prieto—the viaduct spans 8.9 kilometers alongside the Santa Catarina River. 

This engineering initiative features a cutting-edge design that has been adapted to comply with current regulations and approved by the relevant authorities, making a significant contribution to the region's progress. 

To carry out this project, we used plants operating 24 hours a day, 5 pumping units, more than 30 concrete mixer trucks to pour more than 230,000 m³ of concrete, and 30,940 metric tons of steel for more than 200 supports, 1,860 piers, and pile foundations measuring 19 meters in length.

‍

Road conditions in the state of Nuevo León have improved with the construction of this highway.
Road conditions in the state of Nuevo León have improved with the construction of this highway. 

‍

‍

A project that protects the environment 

The Santa Catarina Viaduct is illuminated at night thanks to solar energy absorbed by more than 300 LED lights installed along its 8.9-kilometer length. 

This infrastructure reduces emissions of air pollutants and includes an environmental offset plan with numerous measures that uphold its commitment to protecting the natural resources in the Santa Catarina River basin, such as:

✔ Wildlife Protection  

✔ Water Quality Monitoring

✔ Waste collection by type 

✔ Designation of areas for the restoration, recovery, and reforestation of native species. 

‍

These measures extend beyond the design and construction phases of the viaduct, thereby protecting our planet. 

‍

‍

Build with quality 

The projects we undertake contribute to the country’s transportation and economic development. Learn more about our infrastructure projects, tell us about yours, and let’s turn your ideas into sustainable buildings. Build with GP Construcción—build with quality.  

‍

‍

Share this article